PILGANGOORA LITHIUM

CLIENT
Altura Mining Limited

PROJECT
Pilgangoora Lithium

LOCATION
Pilbara, Western Australia

CONTRACT AWARD VALUE
$110 million

START DATE
March 2017

COMPLETION DATE
2022

 

PROJECT DESCRIPTION

Location

Altura Mining’s Pilgangoora Lithium Project is located in the Pilbara, Western Australia, approximately 90 kilometres south east of Port Hedland.

Scope of Work

NRW will be carrying out the contract for the mine development, drill and blast and mining services. Up to 35 people will be required to complete the below scope of works.

  • Construction of the workshop, equipment laydown areas, earth work site infrastructure and mine haul roads
  • Bulk earthworks for tailings dam
  • Mining services include:
    – Clear and grub
    – Drill and blast
    – Load and haul
    – Five million BCM will be mined throughout the project’s five-year duration

Throughout this project NRW will utilise the following machinery and equipment:

  • Hitachi 2500 Excavator
  • Five Cat 785 Dump Trucks
  • Hitachi 1200 Excavator
  • Three Cat 777 Dump Trucks
  • D10 Dozer
  • Two 16G Graders
  • Two 40 Tonne Artic Water Carts